The CapEx Planning Checklist Most Multifamily Owners Skip

The six-item CapEx checklist 345 CARES walks asset managers through on every Metro Atlanta multifamily portfolio scope.

Most CapEx programs run late and over budget for the same three reasons. Not because the GC was bad. Because the scope was finalized after the calendar got tight, the inspection items weren’t flagged on the walkthrough, and the paperwork didn’t satisfy the lender on the first submission.

Multifamily property manager reviewing capital expenditure planning checklist on laptop at desk

This is the checklist we walk asset managers through when they bring us in for a portfolio scope across Metro Atlanta.

1. The walkthrough has to happen in Q3, not Q4

The single biggest cost driver on a CapEx program is when the scope gets finalized. By Q4, the GC bench is already booked for Q1 starts. Material lead times stretch. The unit turn calendar collides with lease renewals.

Walk every property by August. Document the roof, envelope, mechanical, common-area, and unit-interior scope before the budget locks. The buildings that pass inspection on the first attempt are the ones where the scope was clear in October, not February.

2. Inspection items get documented separately from cosmetic items

Most CapEx scopes bury the inspection-driven work inside the cosmetic line items. That’s how you end up paying for unit turn paint and discovering, on day three, that the GFCI count doesn’t meet current code.

Separate the inspection-required items from the cosmetic items on the scope sheet. Get an electrical, mechanical, and ADA pass on every building before the budget goes to ownership. The cost is small compared to the change orders that show up mid-job.

3. ADA retrofits are the most-skipped, most-expensive late find

ADA compliance is the line item most asset managers underweight on older buildings. The buildings that need it most are the 1980s and earlier multifamily product across Metro Atlanta, which is most of the value-add inventory.

Common required retrofits on older Atlanta multifamily:

  • Path-of-travel grading and ramps at building entries
  • Bathroom clearances and grab-bar mounts in accessible units
  • Common-area signage and tactile elements
  • Pool and amenity area access
  • Parking stall count and van-accessible stall placement

The cost range varies, but the pattern is consistent: a retrofit caught during CapEx planning is a fraction of the cost of one caught during a sale due diligence or a fair housing complaint.

4. The paperwork has to satisfy the lender on the first submission

The bonded, insured, and licensed paperwork your asset manager or lender needs on file is not optional, and it should not be a follow-up email. The standard on most institutional multifamily projects:

  • Active GC license with the state
  • $2M general liability minimum
  • Performance bond on the project value
  • Workers’ comp certificate
  • Lien waivers on each progress draw
  • Final inspection sign-off

If the GC can’t put all six on the table at contract signing, the project will slow down at every draw.

5. The timeline has to be written, not verbal

Verbal timelines slip. Written timelines hold both sides accountable. The minimum a written CapEx timeline should include:

  • Mobilization date by building
  • Scope completion date by trade
  • Inspection submission date
  • Lien waiver and draw schedule
  • Punch list walkthrough date
  • Final inspection date

If the GC won’t commit to these in writing on day one, the calendar isn’t real.

6. The punch list gets walked before the crew demobilizes

The single most common cause of a CapEx job slipping into the next month is a punch list discovered after the crew has already left the site. Mobilizing a crew back to a property to chase punch items costs three to five times what it costs to walk the punch before demob.

Walk the punch list with the GC, the PM, and the asset manager before the final inspection is scheduled. Document with photos. Sign off in writing.

What 345 CARES does for the asset managers we work with

We do this checklist as a service. Property walkthrough, scope documentation, inspection-item flagging, ADA pass, written timeline, and the paperwork your lender needs at signing. We’re a licensed GC in Georgia, bonded, with $2M general liability, and we hold NAHB and Atlanta Apartment Association membership.

We work with PMs and asset managers across Metro Atlanta on multifamily renovations, CapEx programs, tenant build-outs, and ADA retrofits. The standard is pass inspection on the first attempt.

If your 2027 CapEx is still a budget number and not a documented walkthrough, that’s the work for this quarter.

Request a property walkthrough. info@345cares.com

345 CARES BLOG

Contractor reviewing renovation plans with homeowner in modern Atlanta kitchen
10 Questions to Ask a Contractor Before a Major Atlanta Renovation
The bid you compare last is rarely the bid you should pick. These questions separate the contractors who finish jobs from the ones who don't.
Before and after construction photos of an Atlanta home renovation showing framing and updates.
Why Your Atlanta Renovation Needs Photo Documentation From Day One
The single most important question to ask a renovation contractor isn't "how much" or "how long." It's how they will document the work.
Atlanta renovation contractor for local service businesses
How to Vet an Atlanta Renovation Contractor Before You Sign
The wrong contractor turns a 90-day project into a 7-month nightmare with $80,000 in change orders. Here's how to vet one before you sign.
Multifamily property manager reviewing capital expenditure planning checklist on laptop at desk
The CapEx Planning Checklist Most Multifamily Owners Skip
The six-item CapEx checklist 345 CARES walks asset managers through on every Metro Atlanta multifamily portfolio scope.
Atlanta renovation photo documentation for local service businesses
Atlanta Renovation Photo Documentation: Why You Need It From Day One
Atlanta renovation photo documentation protects your budget, timeline, and trust. Here is why every project should start with the camera on day one.
Retail Tenant Improvement (Design to CO)
Demolition and reconstruction of an exterior concrete staircase at Kennesaw State University, including sitework, grading, and landscape restoration in an active campus environment.
How We Work

From First Call to Final Walkthrough

A clear, predictable process built on communication, precision, and zero surprises.

01

Discovery Call

We learn your goals, timeline, and budget. You get honest feedback on feasibility and next steps.

30-min call
02

Site Visit & Scope

We walk the space, document conditions, and develop a detailed scope of work with transparent pricing.

Detailed proposal
03

Build & Communicate

Construction kicks off with weekly updates, milestone tracking, and direct access to your project lead.

Weekly updates
04

Final Walkthrough

Punch list completed, inspections passed, keys handed over — with warranty documentation and ongoing support.

100% complete

Ready to start? Let's talk about your project.

Start Your Project
No obligation Transparent pricing Pass Inspection Guaranteed
Why Commercial Leaders Choose 345 CARES

Precision. Partnership. Performance.

Since 2017, we've delivered 2M+ SF across Metro Atlanta with an 86% client return rate — because commercial success demands more than promises. As a full-service construction company in Atlanta GA, we bring the same standards to every project — from single-unit renovations to portfolio-wide capital programs.

Code-Compliant Execution

Every project meets rigorous local codes, ADA requirements, and safety standards — protecting your investment from costly rework.

100% Inspection pass rate
on first submission

On-Time, On-Budget Delivery

Data-driven project management with weekly progress reports, real-time budget tracking, and proactive communication at every milestone.

7+ Yrs Delivering complex
commercial projects

True Partnership, Not Just a Bid

We integrate with your architects, engineers, and stakeholders from day one — aligning every decision with your operational goals.

86% Client repeat
business rate

Transparent, Accurate Proposals

Line-item proposals built on real site conditions — not ballpark estimates. No surprises mid-project, no inflated change orders.

1,000+ Projects completed
across Metro Atlanta
Credentials & Coverage
Licensed & InsuredGeorgia State License
Fully BondedCommercial Coverage
$2M LiabilityGeneral & Professional

Ready to Build with a Partner Who Delivers?

Tell us about your project and we'll put together a plan that works for your timeline and your budget.

Start Your Project
345 CARES veteran housing — giving back to Metro Atlanta GA

They served this country.
The least we can do is build them a home.

345 CARES partners with Atlanta nonprofits to build affordable, accessible housing for veterans — showing up as a trade partner, not just a donor. Every project you give us helps make this possible.

See How We Give Back
— 345 CARES Construction, Metro Atlanta

Start a Project Conversation

Inquiry Received

Our team will follow up to discuss scope and next steps.